Industrial CASE STUDIES

HydroFLOW Thrid Party Verification Report-Tulsa

Prepared By

Samuel Jeyanayagam, PhD, PE, WEF Fellow/Jacobs Engineering.

 

Customer

Tulsa Southside Wastewater Treatment Plant, Tulsa, Oklahoma.

 

Application

Struvite scale buildup.

 

Installed Unit

HydroFLOW Industrial i160.

 

Background

The primary objective of this independent, third-party technology verification is to validate the effectiveness of the HydroFLOW i Range product with respect to controlling struvite scaling at selected test sites. The verification is based on a review of visual observations and discussion with plant staff. It focuses on identifying changes to struvite scaling before and after installing HydroFLOW units. 

 

Conclusion

This Third-Party Technology Verification Report validates that the use of a HydroFLOW i Range unit at the Southside WWTP prevented scale formation in a BFP used for dewatering anaerobically digested sludge. The HydroFLOW unit also caused changes in the physical characteristics of the existing scale, making it easier to be removed. 

 

For the full report please click on the PDF.