Commercial Case Studies

Office building cooling towers in the US southeast

Installer
Southeast Pump & Equipment.

Application
Cooling Towers.

Installed Units
HydroFLOW Custom i14".

Background
Due to high water costs, the facilities manager ran the cooling towers at high cycles of concentration in order to reduce water usage, which resulted in severe scale and bio problems. The main challenge was to reduce bio-counts from 100,000 to under 10,000 CFU.

Results
After a few short days with a HydroFLOW i14” device, the CFU count dropped to under 1,000. Other added benefits included reduced scale and biofilm accumulation in the cooling tower and chiller tubes. The i14” device helped the commercial complex achieve a return on investment of roughly six months, which led to the installation of multiple custom HydroFLOW devices on cooling towers and potable water systems throughout the commercial complex.

Click on the PDF for more detailed information.