Case Study

Savings in 1,000 Ton Cooling Tower

Installer

 

HydroTech Solutions.

 

Customer

 

Fortune 100 Headquarters LEED Gold Building Houston, Texas 

 

Application

 

Cooling Towers and chillers.

 

Installed units

 

HydroFLOW industrial custom unit.

 

Background

 

Fortune 100 LEED Gold certified headquarters in Houston, Texas, identified the need to improve water conservation in the cooling system to reduce cost, save energy and reduce chemicals. 

 

Success Factors

 

  • Prevent scale and biofouling accumulation in the tower and chillers.

 

  • 50% water reduction with cost savings that offset the monthly program cost.

 

  • Optimize chemical program effectiveness and change to eco-friendly chemistry.

 

  • Extend service life of equipment, fill and piping.

 

  • Reduce energy costs and maintenance expenses.

 

Results

 

  • All key success factors were met within a few months.

 

  • Existing chiller scale removed during first 6 months.

 

  • 2.6 Million Gallons Conserved Annually per 1,000 Ton Cooling Tower.

 

For the full case study please click on the PDF.